Page 30 - May 2018 - December 2018 Issue
P. 30
MPT South Shifts
Focus on Execution
By Sigrid Shun, Human Resources and Administration
Management of Metro Pacific “To improve is to change, to be know now what is our purpose and said, “Build as one. Execute as one,
Tollways South (MPT South) gathered perfect is to change often.” – our purpose is to share in the the 4DX fashion.”
on May 29, 2018 at the I’m Hotel, Winston Churchill aspirations of Metro Pacific Tollways
Makati for the 2018 First Trimester Corporation (MPTC) and grow the The session ended with Metro Pacific
Performance Review. “Times and conditions change so business in the South.” Tollways President Rod Franco
rapidly that we must keep our aim highlighting the projects in the
One year after the integration of constantly focused at the future.” Pleased with the performance different local business units and the
Metro Pacific Tollways South – Walt Disney reports, MPT South President Luigi, positive outlook four to five years
organization, MPT South President recapped that in terms of revenue from now. He said, “But because of
Luigi Bautista has observed, “We are Thus, MPT South President Luigi, and traffic growth we are on track the task at hand, we have decided as
talking as one,” despite managing concludes that MPT South needs to and progressing well with the a group collectively to adapt this
two concessions – Cavite Expressway constantly change. According to him, projects in C5 South Link and execution system (4DX or Four
(CAVITEX) and Cavite Laguna “For MPT South to be prepared for CALAEX – Laguna. Disciplines of Execution) and this
Expressway (CALAEX). the competition, and we know that performance management system
the competition is very fierce, and to Convinced that MPT South is headed (BSC or Balanced Scorecard) to be
MPT South President Luigi cited two be ready for the future as I said, we at the right direction, MPT South our primary tools to enable us to get
quotes that aptly described what need to change without end. So MPT President Luigi enjoined the MPT to the future we desire.”
MPT South needs to be doing. South has taken an Identity not only South management that the focus
do we know who we are. We also now has shifted to execution. He
29 | NEWS AND EVENTS